Shutdown & Turnaround Optimization
Industry: Mining & Industrial
Client Situation
A large mining and processing operation faced repeated shutdown overruns, unclear scope definition, and poor coordination between maintenance, operations, and contractors.
Challenges
- Shutdown scope was not risk-based
- Job plans lacked detail and accurate duration estimates
- Contractor coordination was inconsistent
- Materials and parts were not staged properly
- Post-shutdown reliability was unpredictable
Approach & Methodology
- Conducted a full shutdown readiness assessment
- Developed a risk-based scope definition process
- Rebuilt job plans with accurate durations and resource requirements
- Implemented a shutdown control room and daily performance tracking
- Improved contractor onboarding and communication protocols
- Established post-shutdown reliability checks
Key Deliverables
- Shutdown readiness checklist
- Detailed job plans and resource loading
- Contractor coordination framework
- Daily shutdown dashboard
- Post-shutdown reliability verification process
Results & Impact
- Shutdown duration reduced by 14%
- Cost overruns eliminated
- Improved schedule compliance
- Higher post-shutdown equipment reliability
- Better coordination between maintenance and operations